Before starting construction, you need to go through several administrative and technical steps. The process can be summarized simply:
First, you need to understand the status of the land and the conditions under which construction is allowed.
The certificate establishes the conditions and requirements that must be followed when developing the project.
Based on the certificate, the project documentation for the planned construction is prepared.
The documentation must go through the approval procedures required by the legal framework.
After completing the required steps, an application for the building permit is submitted. Procedures and document records are also managed through SIA GEAP.