The cost of building a house at the shell stage in Moldova depends on its size, structural system, materials, design and site conditions.
In 2026, a rough estimate is around €300–€450 per m². For example, a 100 m² house could require approximately €30,000–€45,000 at this stage.
The shell stage usually covers the main structural work: foundation, walls, load-bearing elements, floor slabs and roof. The exact scope depends on the contract, so some works or materials may be priced separately.
The cost can increase if the site requires a more complex foundation, the house has a complicated design or several floors, or more expensive materials are chosen.
That is why the price per square meter should only be treated as an initial estimate. A realistic budget should be calculated from the actual project and a detailed construction estimate.